SHANDONG VINSON MACHINERY CO.,LTD
Tel: 0086-535-6511737
Fax: 0086-535-6513072
Skype: sdwin66
Mobile & Whatsapp: 0086-18615022312
Email: sales1@zmmachinery.com
Address: No. 55-1, Zhichu Raod, Zhifu District, Yantai City, Shandong, China
Fax: 0086-535-6513072
Skype: sdwin66
Mobile & Whatsapp: 0086-18615022312
Email: sales1@zmmachinery.com
Address: No. 55-1, Zhichu Raod, Zhifu District, Yantai City, Shandong, China
current location:home>>News>>Company news
Operation of the belt filter
1. Before starting the motor, check that the voltage and motor wiring voltage is correct to prevent errors.
2. Before starting the motor, tighten the dosing valve and then open the exhaust valve, so that the gas from the catheter into the dosing tank.
3. Before use must first check whether the inlet and outlet piping has been installed, and the inlet and outlet pipe fixed in the tank, so that the entrance is not easy to swing. The same time as the above-
4. After the above operation is completed, start the pump motor to start operation, should pay attention to whether the direction of pump operation is correct. The same time as the above-
5. Filter before use, first check the pressure gauge diaphragm is filled with water, please fill the water and then lock the pressure gauge to maintain the correctness of the pressure gauge.
6. Open the exhaust valve and then open the valve, the water from the dosing tank into the pump through the tank and the inlet tube, so that the inlet tube filled with liquid, or open the filter cover to remove the cover, the water Injected from the cartridge, so that the inlet tube filled with liquid.
Technical Improvement of Flocculation Device for Vacuum Belt Filter
The structure of the vacuum filter frame