SHANDONG VINSON MACHINERY CO.,LTD
Tel: 0086-535-6511737
Fax: 0086-535-6513072
Skype: sdwin66
Mobile & Whatsapp: 0086-18615022312
Email: sales1@zmmachinery.com
Address: No. 55-1, Zhichu Raod, Zhifu District, Yantai City, Shandong, China
Fax: 0086-535-6513072
Skype: sdwin66
Mobile & Whatsapp: 0086-18615022312
Email: sales1@zmmachinery.com
Address: No. 55-1, Zhichu Raod, Zhifu District, Yantai City, Shandong, China
current location:home>>News>>Company news
Skills for managing sewage treatment equipment
First, use a good device
All kinds of equipment must have operating procedures and provide operating procedures. Equipment operating procedures are mainly based on the combination of site conditions of the equipment manufacturer's instructions. Workers must strictly follow the operating procedures. Equipment operating conditions should be recorded during use.
Second, maintain the equipment
All kinds of equipment should have maintenance regulations. The maintenance regulations should be formulated in accordance with the site conditions of the equipment manufacturer's instructions. The maintenance regulations can also be put together with the operating rules. The maintenance regulations include cleaning, adjustment, tightening, lubrication, and corrosion protection. Maintenance work should also be recorded. Maintenance work can be divided into: Routine maintenance - refers to the inspection and maintenance in operation. Qualified maintenance - regular shutdown inspection and maintenance. Park maintenance - refers to the maintenance of spare units or idle equipment. Seasonal maintenance—refers to seasonal maintenance of equipment such as summer, winter, and rainy days, including measures such as sun protection, cold protection, moisture protection, and cooling.
Third, repair equipment
The equipment maintenance standards for major equipment are established, and maintenance and technical performance are restored. For some equipment, it is necessary to clarify the boundaries of large, medium, and minor repairs, and implement the division of labor. The main equipment must have a clear overhaul period and implement regular inspections. Do not think of repairs until the damage is severe. For routine repairs, maintenance overhaul quotas should be established to reduce maintenance costs. Detailed records should be maintained for each overhaul.
Fourth, manage the equipment
The “pipe” mentioned here refers to the management of the whole process of equipment purchase-installation-commissioning-acceptance-use-maintenance-inspection-disuse-updating. Including equipment capital management (overhaul, depreciation, etc.) should have provisions for each link.
The difference between vacuum belt filter press and belt filter press
Industrial wastewater treatment plant high efficiency characteristics